Bid or No Bid? How to Read a Public Tender in 15 Minutes
By Shaghil Shahzad, Easify AI · · 3 min read
Most tenders are not worth bidding for. That is not pessimism: a tender written for a supplier twice your size, in a region you don't cover, or with a deadline next week, is a poor use of a bid team's time.
The skill is spotting that quickly. This method gets you to a clear bid or no-bid decision in about 15 minutes, before anyone opens a blank document.
Read in a fixed order
Tender packs are long, and they are not written in the order you need. Don't read front to back. Read in this order:
- Deal-breakers (5 minutes): can you bid at all?
- Scope and fit (5 minutes): is this work you do well?
- Effort and odds (5 minutes): is it worth it?
If anything in step 1 fails, stop. You have just saved a day.
Step 1: the five deal-breakers
| Check | Where to find it | Walk away if |
|---|---|---|
| Eligibility | Selection questionnaire, conditions of participation | You miss a turnover, insurance or certification minimum |
| Location | Notice, specification | The delivery area is outside where you can work |
| Size | Estimated value, lots | The contract is far outside your usual range |
| Timing | Deadlines, start date | You cannot submit well, or deliver on the start date |
| Route to market | Notice | It is restricted to a framework you are not on |
Tip: turnover requirements are often expressed as a multiple of the annual contract value. Do the sum before you read anything else.
Step 2: scope and fit
Now read the specification summary, not the whole document. Ask three questions:
- Is the core of the work something we already do well? Not "could do": already do.
- Do we have a similar past project we can point to as evidence?
- Is anything unusual in the requirements, such as a specific system, accreditation or way of working?
If the honest answer to the first two is no, the tender is a stretch. Stretch bids are sometimes right, but they should be a deliberate choice, not a default.
Step 3: effort and odds
Finally, estimate whether the bid is worth the work.
| Factor | Good sign | Warning sign |
|---|---|---|
| Relationship | You know the buyer, or they engaged the market early | First contact is the tender itself |
| Competition | A specialist requirement that suits you | A broad requirement that suits everyone |
| Evaluation | Quality weighted strongly | Price weighted heavily, in a market you don't lead on price |
| Effort | A short response with clear questions | Many method statements, presentations and samples |
Watch out: a tender that appears from nowhere with a short deadline may already have a favourite. Early market engagement and pipeline notices are the best sign that a buyer is genuinely open.
Make the decision, and write it down
End with one of three outcomes: bid, no bid, or watch (not this one, but follow the buyer). Write one line on why. Over a few months, those lines show which tenders you actually win, and the decision gets faster.
Where automation helps
Steps 1 and 2 are mostly reading and checking against criteria you set once, which is exactly what software does well. A tender radar can read each new notice and its documents, check them against your deal-breakers, and send you only the tenders that pass, with a summary of scope and risks.
- TriggerNew tender
From the portals you watch
Find a Tender - AIDeal-breakers checked
Eligibility, location, size, timing
Claude
- AIScope summarised
Fit and unusual requirements
Claude
- YouYou decide
Bid, no bid or watch
- ResultDecision logged
With the reason
Excel
The decision itself stays with you. We show how a typical build works in our tender radar use case.
Summary
- Read in order: deal-breakers, then scope, then effort.
- Five deal-breakers rule out most tenders in minutes.
- Score fit and odds honestly before anyone starts writing.
- Record every decision with a reason, so you learn which bids you win.
Frequently asked questions
- What is a bid/no-bid decision?
- It is the decision, made before writing anything, about whether a tender is worth the time it takes to bid. A clear method stops teams spending days on bids they were never likely to win.
- What are the most common reasons to not bid?
- Failing an eligibility requirement such as turnover, insurance or certification; being outside the delivery area; a contract far bigger or smaller than you usually deliver; a deadline you cannot meet; or the work being reserved for suppliers on a framework you are not on.
- Can AI make the bid/no-bid decision?
- It shouldn't. AI can read the documents and check them against your criteria quickly, but the decision depends on judgement about relationships, capacity and strategy that stays with your team.
